Total Pageviews

Friday, June 3, 2011

External Viva schedule

Use below link for external viva schedule


http://www.4shared.com/document/iALvczsh/ext_prac_even11.html

Project Detail:

Every student have to bring individual report file with cd, and your viva is scheduled in 2 days 8th for CSE 8A students in 2 groups serial no:(1-30 and 31-60), and same for CSE 8B in 9th (61-90 and 91-119). If in any project all the project member are from same group then there viva will be in a group, otherwise there viva will be in there scheduled groups and timing.

If still have any query, contact me.